When running the tests in slow mode with --enable-debug on a very loaded
system, the fp-test-mulAdd test can take longer than 2 minutes. Bump the
timeout to three minutes to make sure it passes in such situations, too.
Signed-off-by: Thomas Huth <thuth@redhat.com>
Message-Id: <20231215070357.10888-16-thuth@redhat.com>
Signed-off-by: Alex Bennée <alex.bennee@linaro.org>