fa020ef10b
On a loaded system with --enable-debug, this test can take longer than 5 minutes. Raising the timeout to 6 minutes gives greater headroom for such situations. Signed-off-by: Daniel P. Berrangé <berrange@redhat.com> [thuth: Increase the timeout to 6 minutes for very loaded systems] Signed-off-by: Thomas Huth <thuth@redhat.com> Message-Id: <20231215070357.10888-11-thuth@redhat.com> Signed-off-by: Alex Bennée <alex.bennee@linaro.org> (cherry picked from commit e8a12fe31f776c60fec993513cd1b1e66c2b8e29) Signed-off-by: Michael Tokarev <mjt@tls.msk.ru> (Mjt: context fixup in tests/qtest/meson.build)