On a loaded system with --enable-debug, this test can take longer than
5 minutes. Raising the timeout to 6 minutes gives greater headroom for
such situations.
Signed-off-by: Daniel P. Berrangé <berrange@redhat.com>
[thuth: Increase the timeout to 6 minutes for very loaded systems]
Signed-off-by: Thomas Huth <thuth@redhat.com>
Message-Id: <20231215070357.10888-11-thuth@redhat.com>
Signed-off-by: Alex Bennée <alex.bennee@linaro.org>
(cherry picked from commit e8a12fe31f)
Signed-off-by: Michael Tokarev <mjt@tls.msk.ru>
(Mjt: context fixup in tests/qtest/meson.build)